Integrated fertilizer unloading platform and railway wagon pit system

Client: AMEROPA – CHIMPEX S.A

Overview

Ludan Engineering delivered a turnkey infrastructure solution for CHIMPEX, designing and executing a fully integrated fertilizer unloading platform and railway wagon pit system at the Port of Constanța. The project was strategically developed to streamline bulk material handling, enhance operational throughput, and support CHIMPEX’s role as a key logistics hub in the agribusiness supply chain.

Key achievements include:

  • Engineering and design of high-capacity unloading systems for granular and bulk fertilizers
  • Development of a custom railway pit system enabling efficient bottom-discharge from wagons with minimal turnaround time
  • Procurement and supply chain coordination for specialized mechanical and civil components
  • End-to-end project management and construction oversight, ensuring timely delivery, regulatory compliance, and operational readiness

This project exemplifies Ludan’s ability to deliver complex industrial infrastructure with precision and speed, helping CHIMPEX optimize port logistics and reinforce its strategic position in agricultural trade.